Kate Mazzara and Venu Nemani of SHA District 3 will be at tonight’s work session to present SHA’s future maintenance plan of the Greenbelt Road (MD 430) from US 1 (Baltimore Avenue) to MD 193 (University Boulevard). The total distance of the project is approximately 0.42 miles.
The maintenance work includes pavement patching, grinding and resurfacing the existing pavement, repairing existing inlets, cleaning of existing inlets and pipes, curb and gutters repair/replacement, installing pavement markings, ADA Ramp replacements and Installation of crosswalks.
Details on the scope of the work can be found here: http://goo.gl/Tt41q2 .